- Changchun Rongde Optics
- Co.,Ltd.
- Add:No.1666 Yaan Road,
- North Lake Development District,
- Changchun 130102,China
- Tel:86-431-81881745
- Fax:86-0431-85256892
- E-mail:rongdecui@roundss.net
- Skype:adacui_roundss
Company News
Current position :Home > News > Industry News
Packing process Operating instructions!
Changchun Rongde Optics Co.,Ltd. Release time:2018/9/28 Browse:1008Total name:Packaging
Model:common
Operation number:5
Process content:packaging
Version:A/1
Issue date:
Revision date:
Made:
Checked:
Certified:
Input parts: Part No/specification:
Quantity:
Product Name: 50 draw wire box
Product model: 0-10K
Product ID:
Client:
Confirm items:
1. Confirm the product model number.
2. Confirm the original line number, line type, line color, and wire diameter.
3. The original line cannot be damaged, deformed or oxidized.
4. Confirm the name of the sheath.
5. Confirm the locking pieces, rubber parts and other auxiliary materials.
6. Confirm the direction of the incoming line view.
Operating instructions:
1. The terminal is plugged into the position and the sheath is locked in place.
2. Prevent mixed roads and wrong roads.
3. The connector is free from damage and deformation.
4, the sheath and parts to prevent misuse or leakage.
5, the sheath is intact and no damage.
6.Wear rubber parts and insert the sheath before inserting.
Key quality point:
After the terminal is inserted,then lightly pull the line to confirm whether it is in place.
Mark
DA
Material details:
Shielded wire:
P1 RED
P2 BLACK
P4 WHITE
P6 GREEN Shielding Net
Type : Sheath
Material type / specification: MOLEX
Quantity: 1
Note:
It is strictly forbidden to carry out the private repair of the plugged sheath. If it needs to be repaired, there should be a special repair personnel to carry out the repair
Previous:Motor with encoder zero phase compensation method and deviceⅤ
Next:The absolute encoder apply in calcium carbide furnace automation control