Changchun Rongde Optics Co.,Ltd.

Roundss News
  • Changchun Rongde Optics
  • Co.,Ltd.
  • Add:No.1666 Yaan Road,
  • North Lake Development District,
  • Changchun 130102,China
  • Tel:86-0431-81856009
  • Fax:86-0431-85256892
  • E-mail:rongdecui@roundss.net
  • Skype:adacui_roundss

Company News

Current position :Home > News > Support

HAAS MPG Correction Report!

Changchun Rongde Optics Co.,Ltd.   Release time:2018-10-29   Browse:1232

For the two returned products received on Saturday, October 27, 2018; Reasons for return: stuck and delayed signal;
Reason for stuck: After inspection, it was found that there was a bump in the appearance of the product, causing the rotation to be stuck; Cause: It may be caused by accidental fall.

Signal delay: After testing, the product supply voltage  ≤ DVC5V, the signal is normal;The supply voltage > DVC5V, the 1 channel signal is lost, After re-matching and re-soldering the resistance, it returns to normal.
Cause: The relative position of the Luminous tube and the receiving tube is appear slight turbulence caused by a mismatch in the matching resistance.. The resistor does not match. Elimination of the fault after re-matching the resistor;
Corrective Action:
For bumping, in the process of subsequent logistics and transportation, it is easy to handle and paste the fragile logo.

For signal delay: increase the frequency of inspection and assembly of the installation and installation of the luminous tube, and provide skills training for the operators.
Apologize:
In response to this quality issue,We apologize for the inconvenience caused to your company. The quality problem products of our company gave unconditional return.

 

                                             Changchun ROUNDSS Optics
                                                 Quality department
                                             Monday, October 29, 2018



Previous:Precautions in servo motor encoder measurement
Next:Encoder interference solution

[Return to the previous page]